March 2014 -> May 2014

  1. Construction of two reinforced decant rail footings o Concrete footing s construction on steep slope – 2 x 140 m long beams, 900 deep x 800mm wide – HD Bolts every 900mm. o We managed to construct the rail footing on time, within budget and with no safety issues. o Overcame construction and concrete installation issues due to angle of landscape slope.
  2. Construction of footpaths and stairs around site amenities 3. Concrete slab extensions 4. Plant and Machinery “dry” and “wet” hire.